Pilot review
The 107 buildings on the Pilot were put on a pathway to assessment, starting with pre assessment checks made by an appointed fire engineer consultant.
51 were assessed as being out of scope of the Housing (Cladding Remediation) (Scotland) Act, following a review by the appointed fire engineering consultants.
Of the 56 buildings within scope:
- 10 of the buildings have been taken on by the developer
- two were identified by the fire engineers as being low risk and not requiring an SBAource
- 12 have had or are undergoing an SBA commissioned by Scottish Government
- 32 will require an SBA – these will now have the opportunity to be funded for assessment through the Single Open Call
Source: https://www.gov.scot/publications/cladding-remediation-programme-factsheet/pages/cladding-remediation-programme-pilot/